Showing posts with label ibs. Show all posts
Showing posts with label ibs. Show all posts

Saturday, July 16, 2011

lawatan kilang

bagunan ni di bina guna sistem IBS sepenuhnya
setahun siap..

rekod tanpa kemalangan

hollow core slab yg dah siap sedia utk di hantar ke tapak

persediaan utk casting hollow core slab
tak sempat nak tengok demontrasi ... nampak macam simple je..

pre tension cable ...utk rasuk yg panjang biasa nya di guna kaedah ni...

quality control, ujian kiub di buat utk setiap batch concrete yg di guna..


rasuk rasuk yg telah siap utk di hantar ke tapak..

sanggar rebar yg di gunakan utk rasuk... di situ ada kekuatan..

rasuk utama dengan persediaan utk menyambut rasuk sisi..


struktur tiang yg baru di tuang konkrit...

agak agak paham ke apa yg di tunjukkan ni... hehe
kalau tak paham baco atikal ni.. hehe

Industrialised Building Systems (IBS) is defined as the complete assembly construction: a construction system where components are manufactured at factories on or off site, transported and then assembled into a structure with minimum work.
IBS utilizes techniques, products, components, or building systems which involve prefabricated components and on-site installation.
The existing technology architecture as can be classified into 5 groups. The first group is the pre-cast concrete framing, panel and box systems. The most commonly used for the construction projects are the beams, columns, slabs and wall systems. There are other components that fall within this group which are the smaller components that could be prefabricated at the factories. The formwork for the pre-cast could be made of hard plastics. Ideally these could be those that are reusable for them to be considered IBS component.